Is the Ubuntu Landscape $0.01/hr pricing based on machine runtime?Landscape : Failure: landscape.lib.amp.MethodCallError: timeoutLandscape Based Management of Public CloudLandscape - Script errorlandscape client registrationLandscape OpenID Authenticationhow to register the container to landscape?Creating repositories under Ubuntu LandscapeLandscape how to send email from landscapeChange landscape Timezone

Using a sealant to stop a toilet tank leak

Bash - draw a vertical line behind lines with variable length

What instructions should I give to an untrained passenger for Hand propping Cessna 172N as a pilot?

How do I negotiate salary when returning to a position I just left?

Demonstrate the type of kernel compression in practice

Why dont electrical receptacles have more than one ground?

Why did the Big Bang produce hydrogen?

Threatening to discontinue a service for a client

Make me speak L33T

Wi-Fi in my fast moving spaceship

Why does the Eurofighter Typhoon pitch up on brake release?

What is my last working day if my one month's notice falls on a Sunday?

In a world where Magic steam Engines exist what would keep people from making cars

Is Earth's Surface "In orbit"?

Is CC'ing the manager in first e-mail regarding urgent matter considered escalation?

Is it acceptable for the secretary to have full access to our entire Outlook agenda?

Does trajectory of an object orbiting a planet depend on the object's mass? (With hypothetical apollo example)

Who are the strongest non-professional GMs?

Quantum circuits explain algorithms, why didn't classical circuits?

How could hearsay be better evidence than direct?

C - wrapping globals in a struct?

Is there a word/phrase that can describe playing a musical instrument in a casual way?

Searching for a Thurston paper with egg / 3-manifold analogy?

Do companies have non compete agreements between each other?



Is the Ubuntu Landscape $0.01/hr pricing based on machine runtime?


Landscape : Failure: landscape.lib.amp.MethodCallError: timeoutLandscape Based Management of Public CloudLandscape - Script errorlandscape client registrationLandscape OpenID Authenticationhow to register the container to landscape?Creating repositories under Ubuntu LandscapeLandscape how to send email from landscapeChange landscape Timezone






.everyoneloves__top-leaderboard:empty,.everyoneloves__mid-leaderboard:empty,.everyoneloves__bot-mid-leaderboard:empty
margin-bottom:0;









0


















When using Canonical's self-service Landscape 1c-per-hour service, how is the amount of hours calculated? I.e. My servers run around the clock, so obviously I would pay 24c per day for each of those. My POS systems are only switched on for ~8 hours a day, though.



My question is: Does Landscape only charge me for the amount of time that each managed machine was switched on, or does it assume every machine is used 24x7?










share|improve this question































    0


















    When using Canonical's self-service Landscape 1c-per-hour service, how is the amount of hours calculated? I.e. My servers run around the clock, so obviously I would pay 24c per day for each of those. My POS systems are only switched on for ~8 hours a day, though.



    My question is: Does Landscape only charge me for the amount of time that each managed machine was switched on, or does it assume every machine is used 24x7?










    share|improve this question



























      0













      0









      0








      When using Canonical's self-service Landscape 1c-per-hour service, how is the amount of hours calculated? I.e. My servers run around the clock, so obviously I would pay 24c per day for each of those. My POS systems are only switched on for ~8 hours a day, though.



      My question is: Does Landscape only charge me for the amount of time that each managed machine was switched on, or does it assume every machine is used 24x7?










      share|improve this question














      When using Canonical's self-service Landscape 1c-per-hour service, how is the amount of hours calculated? I.e. My servers run around the clock, so obviously I would pay 24c per day for each of those. My POS systems are only switched on for ~8 hours a day, though.



      My question is: Does Landscape only charge me for the amount of time that each managed machine was switched on, or does it assume every machine is used 24x7?







      landscape






      share|improve this question













      share|improve this question











      share|improve this question




      share|improve this question










      asked Sep 14 at 16:43









      LyncLync

      33 bronze badges




      33 bronze badges























          1 Answer
          1






          active

          oldest

          votes


















          0



















          Yes, the Landscape SaaS counts managed hours. Hours where a machine are off should not count in the usage.






          share|improve this answer



























            Your Answer








            StackExchange.ready(function()
            var channelOptions =
            tags: "".split(" "),
            id: "89"
            ;
            initTagRenderer("".split(" "), "".split(" "), channelOptions);

            StackExchange.using("externalEditor", function()
            // Have to fire editor after snippets, if snippets enabled
            if (StackExchange.settings.snippets.snippetsEnabled)
            StackExchange.using("snippets", function()
            createEditor();
            );

            else
            createEditor();

            );

            function createEditor()
            StackExchange.prepareEditor(
            heartbeatType: 'answer',
            autoActivateHeartbeat: false,
            convertImagesToLinks: true,
            noModals: true,
            showLowRepImageUploadWarning: true,
            reputationToPostImages: 10,
            bindNavPrevention: true,
            postfix: "",
            imageUploader:
            brandingHtml: "Powered by u003ca class="icon-imgur-white" href="https://imgur.com/"u003eu003c/au003e",
            contentPolicyHtml: "User contributions licensed under u003ca href="https://creativecommons.org/licenses/by-sa/4.0/"u003ecc by-sa 4.0 with attribution requiredu003c/au003e u003ca href="https://stackoverflow.com/legal/content-policy"u003e(content policy)u003c/au003e",
            allowUrls: true
            ,
            onDemand: true,
            discardSelector: ".discard-answer"
            ,immediatelyShowMarkdownHelp:true
            );



            );














            draft saved

            draft discarded
















            StackExchange.ready(
            function ()
            StackExchange.openid.initPostLogin('.new-post-login', 'https%3a%2f%2faskubuntu.com%2fquestions%2f1174166%2fis-the-ubuntu-landscape-0-01-hr-pricing-based-on-machine-runtime%23new-answer', 'question_page');

            );

            Post as a guest















            Required, but never shown


























            1 Answer
            1






            active

            oldest

            votes








            1 Answer
            1






            active

            oldest

            votes









            active

            oldest

            votes






            active

            oldest

            votes









            0



















            Yes, the Landscape SaaS counts managed hours. Hours where a machine are off should not count in the usage.






            share|improve this answer






























              0



















              Yes, the Landscape SaaS counts managed hours. Hours where a machine are off should not count in the usage.






              share|improve this answer




























                0















                0











                0









                Yes, the Landscape SaaS counts managed hours. Hours where a machine are off should not count in the usage.






                share|improve this answer














                Yes, the Landscape SaaS counts managed hours. Hours where a machine are off should not count in the usage.







                share|improve this answer













                share|improve this answer




                share|improve this answer










                answered Sep 15 at 9:40









                simpoirsimpoir

                3712 silver badges6 bronze badges




                3712 silver badges6 bronze badges































                    draft saved

                    draft discarded















































                    Thanks for contributing an answer to Ask Ubuntu!


                    • Please be sure to answer the question. Provide details and share your research!

                    But avoid


                    • Asking for help, clarification, or responding to other answers.

                    • Making statements based on opinion; back them up with references or personal experience.

                    To learn more, see our tips on writing great answers.




                    draft saved


                    draft discarded














                    StackExchange.ready(
                    function ()
                    StackExchange.openid.initPostLogin('.new-post-login', 'https%3a%2f%2faskubuntu.com%2fquestions%2f1174166%2fis-the-ubuntu-landscape-0-01-hr-pricing-based-on-machine-runtime%23new-answer', 'question_page');

                    );

                    Post as a guest















                    Required, but never shown





















































                    Required, but never shown














                    Required, but never shown












                    Required, but never shown







                    Required, but never shown

































                    Required, but never shown














                    Required, but never shown












                    Required, but never shown







                    Required, but never shown









                    Popular posts from this blog

                    Distance measures on a map of a game The 2019 Stack Overflow Developer Survey Results Are Inmin distance in a graphShortest distance path on contour plotHow to plot a tilted map?Finding points outside of a diskDelaunay link distanceAnnulus from GeoDisks: drawing a ring on a mapNegative Correlation DistanceFind distance along a path (GPS coordinates)Finding position at given distance in a GeoPathMathematics behind distance estimation using camera

                    How to get a smooth, uniform ParametricPlot of a 2D Region?How to plot a complicated Region?How to exclude a region from ParametricPlotHow discretize a region placing vertices on a specific non-uniform gridHow to transform a Plot or a ParametricPlot into a RegionHow can I get a smooth plot of a bounded region?Smooth ParametricPlot3D with RegionFunction?Smooth border of a region ParametricPlotSmooth region boundarySmooth region plot from list of pointsGet minimum y of a certain x in a region

                    Genealogie vun de Merowenger Vum Merowech bis zum Chilperich I. | Navigatiounsmenü